By week 7, the strategy is set, the floor plan is close to locked, and the IT inventory is done. Now the move starts touching people outside the core planning team. Weeks 7 to 4 are when vendors get selected, employees find out what's changing, and the workplace transition becomes real. This is Part 2 of a four-part series on how a West Coast office move actually unfolds.

Vendor Selection Is a Package Deal

The mid-phase window is when the mover, the cabling contractor, the furniture installer, the decommissioning vendor, and the IT project management resource all get lined up. Companies that treat these as separate procurement exercises end up with schedule conflicts nobody owns. The freight elevator the mover reserved for Saturday morning is the same elevator the cabling crew needs on Friday afternoon.

A commercial mover with real project management should coordinate this vendor stack, not just show up with trucks. Ask any prospective mover how they handle the handoff between cable-drop completion and furniture install. If the answer is a shrug, they're not the right partner.

Certificates of Insurance, Building Rules, and Move Windows

Every Class A and most Class B buildings in San Francisco, Portland, Seattle, and downtown Sacramento require certificates of insurance from every vendor working on the premises. Limits, additional-insured language, and the exact spelling of the building's legal entity all matter. A COI that's technically correct but misnamed will get bounced at the loading dock.

The move window itself gets locked in this phase. Most downtown buildings restrict freight moves to after-hours or weekend windows, and popular Saturdays book out months in advance. The mover should be pulling the building's move packet, submitting the COI, reserving the freight elevator, and confirming the security escort schedule at both origin and destination. That's what prevents the entire move from getting bumped a week.

Employee Communication Starts Now

Employees should hear about the move from leadership before they hear about it from the elevator lobby. By week 7, the internal comms plan needs to be running: a first all-hands announcement, an FAQ that answers the questions people actually ask (commute, parking, desk assignments, phone booth counts, coffee options), and a weekly cadence of updates as move day approaches.

The questions are always the same. Where will I sit. Is there parking. What's the coffee situation. What happens to my monitor. Getting ahead of these with clear answers cuts the hallway rumors that make the last month harder than it needs to be.

Workplace Change Management, Not Just Logistics

An office move is a change-management project as much as a logistics project. If the new space introduces hoteling desks, shared offices, or a different neighborhood layout, those aren't cosmetic changes. They rewrite how people work, and they need to be trained, not just announced.

The best-run West Coast companies handle this with a workplace transition team that includes HR, IT, and facilities. The team runs training sessions on the new booking system, walks people through the new floor plan before move day, and stages test runs in the new space when possible. Companies that skip this step arrive Monday morning to a floor of confused employees and a stack of desk-assignment complaints that take weeks to work through.

Pro Tip: Schedule at least one "sneak preview" walk-through of the new space for employees two to three weeks before move day. Familiarity kills anxiety, and the questions raised during those walks catch problems while there is still time to fix them.

Decisions That Get Locked Here

Weeks 7 to 4 are also when a batch of second-tier decisions need to close: signage, wayfinding, plant service, cleaning contract, coffee service, printer contracts, security-badge provisioning, and door signage. None are dramatic on their own, but if they hit week 2 unresolved they pile up on top of move logistics and something drops.

The workplace transition team should maintain a decisions log with every open item, owner, and deadline. When week 3 arrives, the log should show mostly green, not a wall of yellow and red waiting to surface at the worst possible time.

Coordination Turns Weeks into Days

The mid-phase weeks are where a good office move separates itself from a chaotic one. Vendor stack coordinated, building paperwork in, employees informed, workplace transition running, and second-tier decisions closing on schedule. Chipman Relocation & Logistics has been coordinating vendor stacks and building requirements for West Coast businesses since 1939, with the project management depth that turns weeks 7 to 4 into a controlled process rather than a scramble. When it's time to plan the next office relocation, request a commercial quote and start with a team that has done the coordination hundreds of times.

 